Queue Step
Serialize concurrent IaCM runs for the same workspace with the queue step.
The Queue step serializes IaCM stage executions that target the same workspace. It prevents concurrent runs from conflicting with each other and provides a deterministic order of execution per workspace.
What is the Queue step used for
The Queue step addresses the following scenarios:
Shared workspaces: A single workspace may be referenced by multiple pipelines or stages.
State protection: Without queuing, simultaneous executions can cause state conflicts.
Determinism: Beyond a low-level lock, the Queue step serializes each pipeline execution to ensure that only one pipeline can execute at a time for a given workspace.
When to use the Queue step
Use the Queue step any time more than one pipeline or stage may operate on the same workspace (or set of resources) and you need serialized execution. Typical cases include:
Multiple pipelines targeting the same workspace
Concurrent triggers on a single pipeline
Long-running applies where overlapping plans could drift
Recommended placement
For best practice, place the Queue step at the very beginning of your IaCM stage, so the entire stage execution is serialized for the target workspace.

ALTERNATIVE QUEUE STEP PLACEMENT
The Queue step can be placed after the plan step, as concurrent plans do not cause conflicts in state files. However, to prevent conflict, ensure that the Queue step is placed before the apply step.
Configuration
Configure the Queue step with a unique resource key that identifies the workspace.

Guidelines
Follow these guidelines when configuring the Queue step:
Uniqueness: Ensure the resource key uniquely maps to the workspace (or resource scope) you want to serialize.
Consistency: Use the same pattern across pipelines so all executions that target the same workspace share the key.
Granularity: If needed, include additional context (e.g., environment) to serialize more narrowly.
Placement pitfalls
Avoid these common mistakes:
After apply: If the Queue step is added after apply, it will not protect the critical section and is effectively a no-op for preventing state conflicts.
Between plan and apply: Avoid placing Queue here. A plan may run, then the stage may queue while another pipeline applies. When the queued pipeline resumes, it could apply an outdated plan, potentially causing state conflicts.
Go to Control resource usage with Queue steps to learn more about the Queue step and integrate with your CD pipelines.